Gallery

A small selection of the bridges we’ve built

Some bridges that may be close to you to view

Quigleys Bridges

loading map - please wait...

54 metre Paero-Tahuna Rd: -37.494674, 175.562725
36m Tahuna Road – Te Hoe: -37.513700, 175.322000
30 metre Over Bridge Puriri SH 26: -37.230200, 175.639000
21 metre Tirau: -37.976800, 175.759000
18 metre Otorohunga: -38.182300, 175.216000
18 metre Silverdale Auckland: -36.617200, 174.678000
15 metre Culvert: -37.358300, 174.828000
Old Mountain Road: -37.849500, 175.058000
ATV 15metre 2015: -37.847903, 175.035777
14metre: -37.475131, 175.502472
2 lane quarry bridge to take 85 tonn: -37.592619, 175.362482
12metre x 2: -37.640811, 175.759835
8 metre: -37.070589, 175.783793
14m chicken farm: -37.584208, 175.785155
14m guardian Trust: -37.716255, 175.853348
2 lane subdivison: -37.813218, 175.380560
8meter: -37.500234, 175.686729
8 meter Fonterra: -37.715990, 175.209661
11 metre: -37.377885, 175.222736
14 metre: -38.218330, 176.211948
12 metre: -38.124551, 176.144228
6 metre: -38.119378, 176.142941
14 metre: -38.316003, 175.146017
12 metre: -37.703869, 175.306177
12 metre woodlands road: -37.646261, 175.402393
5metre long 5 metre wide: -37.638976, 175.369778
8 metre: -36.475880, 174.535074
6 meter play center: -37.866100, 174.886000
5 metre long x 5 meter high under/overpass: -38.276361, 175.173054
irrigator panels: -37.434740, 175.124817
atv 10meter: -37.672625, 175.494747
8 Meters Bridge@ Waingaro road: -37.664561, 175.144472

8 metre Waingaro road, installed Dec 2021

  1. Finishing approaches are ready for drilling posts and fitting a 30m Thrie-beam extension beyond the bridge
  2. The bridge deck has been brought in, completed
  3. This is a replacement for an old council bridge

Before:

After:

54 metre Tahuna/Paero Rd

36m Tahuna Road – Te Hoe

30 metre Over Bridge Puriri SH 26

This overbridge is designed to accommodate both cattle and dairy tankers, as well as trucks and trailers. It is a better option than an underpass, as it imposes no restrictions on vehicle height.

25 metre bridge and 650metres of roading. Manawaru Rd  

Working on head walls. Piles are driven 9m down to solid ground. It’s a big day as we move out to the site. Installation will be complete by the end of the day. 650 metres of roading and the bridge have been completed.

25 metre 400 Weranui Rd, Puhoi

Bridge Installation Schedule:

  • Monday: Girders are lifted into place. The first girder is craned in.
  • Tuesday: The old bridge is removed, and the second girder, along with deck panels, is craned in.
  • Wednesday: The deck is stressed and grouted.

Total duration: 2 days.